No | PROJECT NAME | PERIOD | SCOPE | CLIENT | COUNTRY | OWNER |
---|---|---|---|---|---|---|
49 | RDS/MHL Fractionator Improvement Design | 22. 06 ~ 22. 08 | PR | Hyundai Oil Bank | KOREA | Hyundai Oil Bank |
48 | Hyosung Chemical PSV Calculation(2nd) | 22. 06 ~ 22. 09 | PR | Hyosung Chemical | KOREA | Hyosung Chemical |
47 | LG Chemical OXO Revamp Basic Design & TIC Estimation | 22. 04 ~ 22. 05 | PR.M.P.E.I.C.S | XI C&A | KOREA | LG Chemical |
46 | SM Flare Calculation | 22. 02 ~ 22. 05 | PR | LG Chemical | KOREA | LG Chemical |
45 | K-IPA Flare Load Study & PSV Relief Load Calculation | 22. 02 ~ 22. 05 | PR | SGC eTEC E&C | KOREA | KIPA |
44 | Lotte Chemical Line Project PKG3, Process Early Work | 21. 10 ~ 22. 10 | PR | Lotte E&C | KOREA | Lotte Chemical |
43 | GS Caltex Electric Specification & New Regulation | 21. 09 ~ 21. 12 | E | GS Caltex | KOREA | GS Caltex |
42 | Ginsung C4F6 Plant Basic Design | 21. 09 ~ 21. 11 | PR,M, P,E, I | HI-TECH | KOREA | Jinsung E&C |
41 | n-Hexan 23,0000 Ton/Year Plant Basic Design & TIC Estimation | 21. 06 ~ 21. 07 | P,C,S | S&I | KOREA | LG Chemical |
40 | Gumi Anode Plant Basic Design | 21. 12 ~ 22. 08 | PR,P, E | S&I | KOREA | LG Chemical |
39 | B-Project PSV Load Calculation and Flare Load Study | 21. 04 ~ 22. 03 | PR | e TEC E&C | KOREA | Hyundai Oil Bank |
38 | Process Technical Support Agreement(TSA) | 21. 01 ~ 22. 12 | PR | Hyundai Oil Bank, Hyundai Cosmo, Hyundai Shell Base Oil, Hyundai Chemical | KOREA | Hyundai Oil Bank, Hyundai Cosmo, Hyundai Shell Base Oil, Hyundai Chemical |
37 | MMA PDP Project Basci Design | 20. 07 ~ 20. 10 | PR.M.P.E.I.CSA | Hanwha Total | KOREA | Hanwha Total |
36 | POE FEED Design | 20. 07 ~ 20. 12 | E | Lotte E&C | KOREA | Lotte Chemical |
35 | Saudi Aramco SACE Project / Jafurah Gas Plant Project SPPID Work | 20. 06 ~ 20. 11 | PR | Hyundai Engineering | Saudiarabia | Saudi Aramco |
34 | No.3 PX Debottlenecking FEED Project | 20. 04 ~ 20. 08 | P,I | GS E&C | KOREA | GS Caltex |
33 | LINE PJT PKG3(GHU / BTX / BD Plants) Process Basic Design | 20. 03 ~ 20. 06 | PR | Lotte E&C | INDONESIA | Lotte Chemical |
32 | HSVC OL1 Project Flare Load & PSV Relief Calculation | 19. 10 ~ 20. 09 | PR | eTEC E&C | KOREA | HYOSUNG VINA Chemical |
31 | ABS1,2 BDP Project Basic Design | 19. 08 ~ 19. 12 | PR | S&I | KOREA | LG Chemical |
30 | Hanwha Total Process | 19. 01 ~ 19. 03 | PR | Hanwha Total | KOREA | Hanwha Total |