49 |
RDS/MHL Fractionator Improvement Design |
22. 06 ~ 22. 08 |
PR |
Hyundai Oil Bank |
KOREA |
Hyundai Oil Bank |
48 |
Hyosung Chemical PSV Calculation(2nd) |
22. 06 ~ 22. 09 |
PR |
Hyosung Chemical |
KOREA |
Hyosung Chemical |
47 |
LG Chemical OXO Revamp Basic Design & TIC Estimation |
22. 04 ~ 22. 05 |
PR.M.P.E.I.C.S |
XI C&A |
KOREA |
LG Chemical |
46 |
SM Flare Calculation |
22. 02 ~ 22. 05 |
PR |
LG Chemical |
KOREA |
LG Chemical |
45 |
K-IPA Flare Load Study & PSV Relief Load Calculation |
22. 02 ~ 22. 05 |
PR |
SGC eTEC E&C |
KOREA |
KIPA |
44 |
Lotte Chemical Line Project PKG3, Process Early Work |
21. 10 ~ 22. 10 |
PR |
Lotte E&C |
KOREA |
Lotte Chemical |
43 |
GS Caltex Electric Specification & New Regulation |
21. 09 ~ 21. 12 |
E |
GS Caltex |
KOREA |
GS Caltex |
42 |
Ginsung C4F6 Plant Basic Design |
21. 09 ~ 21. 11 |
PR,M, P,E, I |
HI-TECH |
KOREA |
Jinsung E&C |
41 |
n-Hexan 23,0000 Ton/Year Plant Basic Design & TIC Estimation |
21. 06 ~ 21. 07 |
P,C,S |
S&I |
KOREA |
LG Chemical |
40 |
Gumi Anode Plant Basic Design |
21. 12 ~ 22. 08 |
PR,P, E |
S&I |
KOREA |
LG Chemical |
39 |
B-Project PSV Load Calculation and Flare Load Study |
21. 04 ~ 22. 03 |
PR |
e TEC E&C |
KOREA |
Hyundai Oil Bank |
38 |
Process Technical Support Agreement(TSA) |
21. 01 ~ 22. 12 |
PR |
Hyundai Oil Bank, Hyundai Cosmo, Hyundai Shell Base Oil, Hyundai Chemical |
KOREA |
Hyundai Oil Bank, Hyundai Cosmo, Hyundai Shell Base Oil, Hyundai Chemical |
37 |
MMA PDP Project Basci Design |
20. 07 ~ 20. 10 |
PR.M.P.E.I.CSA |
Hanwha Total |
KOREA |
Hanwha Total |
36 |
POE FEED Design |
20. 07 ~ 20. 12 |
E |
Lotte E&C |
KOREA |
Lotte Chemical |
35 |
Saudi Aramco SACE Project / Jafurah Gas Plant Project SPPID Work |
20. 06 ~ 20. 11 |
PR |
Hyundai Engineering |
Saudiarabia |
Saudi Aramco |
34 |
No.3 PX Debottlenecking FEED Project |
20. 04 ~ 20. 08 |
P,I |
GS E&C |
KOREA |
GS Caltex |
33 |
LINE PJT PKG3(GHU / BTX / BD Plants) Process Basic Design |
20. 03 ~ 20. 06 |
PR |
Lotte E&C |
INDONESIA |
Lotte Chemical |
32 |
HSVC OL1 Project Flare Load & PSV Relief Calculation |
19. 10 ~ 20. 09 |
PR |
eTEC E&C |
KOREA |
HYOSUNG VINA Chemical |
31 |
ABS1,2 BDP Project Basic Design |
19. 08 ~ 19. 12 |
PR |
S&I |
KOREA |
LG Chemical |
30 |
Hanwha Total Process |
19. 01 ~ 19. 03 |
PR |
Hanwha Total |
KOREA |
Hanwha Total |