8 |
N-Project / Commercial Pre-Basic Design |
15. 06 ~ 15. 08 |
PR |
Samyang Genex |
KOREA |
Samyang Genex |
7 |
E1 Daesan Propane Tank Project Basic Design |
14. 02 ~ 14. 08 |
PR.M.P.E.I.C.S |
E1 Corporation |
KOREA |
E1 Corporation |
6 |
#1 CDU Naphtha/Kero Upgrading Process Simulation Basic Design |
14. 01 ~ 14. 03 |
PR |
Hyundai Oil Bank |
KOREA |
Hyundai Oil Bank |
5 |
Iraq AKKAS Gas Field Development Process Simulation Basic Design |
13. 08 ~ 13. 12 |
PR |
DAEWOO E&C |
IRAQ |
Iraq AKKAS |
4 |
Karbala Refinery FEED Verification |
12. 04 ~ 13. 07 |
PR |
Hyundai Engineering |
IRAQ |
IRAQ Refinery |
3 |
#1 RDS Revamping Process Simulation Basic Design |
12. 03 ~ 12. 12 |
PR |
Hyundai Oil Bank |
KOREA |
Hyundai Oil Bank |
2 |
NO2 CDU Revamping Flare Load Analysis |
12. 07 ~ 12. 09 |
PR |
Hyundai Oil Bank |
KOREA |
Hyundai Oil Bank |
1 |
KP PTA Basic Design |
12. 05 ~ 12. 08 |
PR |
HyunEngineering |
KOREA |
KP Chemical |